| CampusesEntertainmentOffice BuildingsTelecommunications | Tacoma MSC Addition This project was a telecommunications switch facility
located in Tacoma, Washington. A mechanical renovation was
provided that included an Automated Logic System. In
addition to monitoring and controlling the building’s
heating, ventilating, and air condition systems, the
Automated Logic System monitors the building’s electrical
PLC system, emergency generator, and generator fuel
systems.
- Owner - Verizon Wireless
- Engineer - WRMS
- Mechanical Contractor - ACCO Engineered Systems
- General Contractor - Howard S. Wright
|