Built for Turner Construction in 1997-1998, this Pleasanton campus is a total of two buildings each with two wings - for a total of 348,000 sq. ft. Total package unit capacity is 1,000 tons. System is evaporative cooled, VAV, Mammoth packages with VFDs, two per building wing. Heating is hot water reheat with boilers on each building. Main duct loops are ACCO oval, zones are all acoustical flex with some pre-insulated aluminum flex duct. There are about 200 tons of water-cooled Mammoth heat pumps and Data Aire computer room units. Condenser water comes from four BAC, closed-circuit cooling towers totalling 640 tons of present and future capacity. There is a full kitchen and cafeteria in one building and a health club in another. Architect and original criteria engineer was HOK, San Francisco.

Project Data

  • 348,000 Sq.Ft. of Usable Space

Project Team

  • Owner - Peoplesoft
  • Architect - HOK
  • Mechanical Engineer - ACCO Engineered Systems
  • General Contractor - Turner Construction

 
© Copyright 2001-2010 ACCO Engineered Systems, All Rights Reserved.