| Mills Peninsula Hospital Project Background & Requirements
The new Mills Peninsula Hospital is a 422,000 sq. ft. base-isolated
OSHPD Level 1 hospital. The new hospital will include 313 beds, 10
operating rooms and 2 C-section rooms.
What ACCO Delivered
ACCO performed extensive pre-constructive services on the project,
which included 3-D BIM Modeling. ACCO also produced the OSHPD permit set
of drawings and details in addition to extensive budget control and value
engineering efforts.
ACCO’s team was able to identify concerns early
in the project to prevent costly delays. As the engineering of the
OSHPD set was being produced we were able to get real time feedback on
how the design related to budget. All facets of the project:
design, BIM, detailing, and cost control was done in house.
The construction of the hospital utilized LEAN integrated team
construction including reverse-phase scheduling, performance reporting
and team problem solving.
The final installation includes 530,000 CFM of custom air handlers
with unit heat recovery, 2400 tons of cooling, 31,500 MBH of heating,
3200 MBH of steam generation and 172,000 CFM of speciality exhaust. |