Projects

Sort by: Project Type, filter by | Geographic Market

Petersen Automotive Museum

Location: Los Angeles, CA

Date: November 2015

Customer Segment: Entertainment/Museums

Project Type: Design-Build, HVAC, Controls, Chiller

Geographic Market: Greater Los Angeles

The project includes a complete exterior transformation and a dynamic redesign of the interior, resulting in a world class museum that showcases the art, experience, culture and heritage of  the automobile. massive renovations to the existing building’s infrastructure and interiors, as well as a major exterior renovation. More

222 Second Street - Plumbing

Location: San Francisco, CA

Date: August 2015

Customer Segment: Office Building

Project Type: Design-Build, Plumbing, LEED*, BIM

Geographic Market: Bay Area

Tishman Speyer commissioned the design and construction of a 26 story class “A” high rise office building. The building is located in the South of Market area of San Francisco. LEED and sustainable building design goals have been at the forefront of the Owner’s vision for the development. More

222 Second Street - HVAC

Location: San Francisco, CA

Date: August 2015

Customer Segment: Office Building

Project Type: Design-Build, HVAC, LEED*, BIM

Geographic Market: Bay Area

Tishman Speyer commissioned the design and construction of a 26 story class “A” high rise office building. The building is located in the South of Market area of San Francisco. More

Governor George Deukmejian Court House

Location: Long Beach, CA

Date: August 2015

Customer Segment: Government

Project Type: HVAC, Design-Assist, BIM, Chiller

Geographic Market: Greater Los Angeles

Based on an AOC review in June 2007, it was recommended that the State construct a new court facility in Long Beach that addresses a current space shortfall and accessibility issues; increases security; replaces a seismically and functionally deficient facility; and provides space for future growth.  More

Levi's® Stadium

Location: Santa Clara, CA

Date: August 2014

Customer Segment: Stadium/Arena

Project Type: Design-Build, HVAC, Controls, BIM

Geographic Market: Bay Area

The San Francisco 49ers kicked off the 2014 season in their new, open air, $1.2 billion stadium in Santa Clara. Construction of the 68,500 seat facility started in April 2012 and concluded before the first preseason game against the Broncos on August 17th, 2014. More

888 Brannan - airbnb

Location: San Francisco, CA

Date: June 2014

Customer Segment: Office Building

Project Type: Design-Build, HVAC, Controls, LEED*

Geographic Market: Bay Area

This five (5) story office building was originally built beginning in 1917. It features more than 300,000 square foot of office space and around 110,000 square foot of retail space. The major renovation which started in 2011 includes a nice large atrium area and upgraded double pane windows while preserving the historic integrity of the building. More

LA Forum Renovation

Location: Los Angeles, CA

Date: January 2014

Customer Segment: Entertainment/Museums

Project Type: HVAC, Controls, Chiller, Mechanical Retrofit

Geographic Market: Greater Los Angeles

The project is a renovation of the Great Western Forum, former home to the Los Angeles Lakers and Kings built in 1967. The Madison Square Garden Company purchased the building and surrounding parking to renovate the venue for concert events. More

Cedars-Sinai Advanced Health Sciences Pavilion

Location: Los Angeles, CA

Date: September 2013

Customer Segment: Hospital

Project Type: HVAC, OSHPD, Design-Assist

Geographic Market: Greater Los Angeles

The 450,000 SF Pavilion is expected to accommodate 500 to 600 patients each day and will house outpatient services for the Cedars-Sinai Heart Institute, neurosciences, Regenerative Medicine Institute and other clinical specialties, as well as outpatient procedure suites. Its innovative design brings patient care and translational research together in one place, allowing physicians and scientists to collaborate closely in developing new procedures and treatments. More

SMUD East Campus Operations Center

Location: Sacramento, CA

Date: September 2013

Customer Segment: Office Building

Project Type: Design-Build, HVAC, LEED*, BIM, LEAN/IPD

Geographic Market: Sacramento/Capitol Corridor

The design of the new SMUD East Campus Operations Center required a highly collaborative approach between all of the team members. Balancing critical facets of the building system including structural, mechanical, electrical and extensive energy modeling. The continual balancing of efficient building envelope construction and energy consumption of the mechanical and electrical systems, allowed the design and construction team to provide the minimum amount of photovoltaic (PV) panels necessary to create a net-zero campus of the 6-story office building and four yard buildings. More

Napa Data Center

Location: Napa, CA

Date: July 2013

Customer Segment: Data Center

Project Type: HVAC, Controls, LEAN/IPD

Geographic Market: Bay Area

The nation’s largest not-for-profit health plan, which leads the way by managing the majority of its medical records electronically, took advantage of a previously established, yet unused, data center in Napa to accommodate its need for extensive electronic file storage. More

  
  