Projects

Dodger Stadium (Remodel)

Location: Los Angeles

Date: September 2003

Project  Requirements

  • In January 1999, the Dodgers announced a program of investment and limited renovation to make the stadium more economically competitive with other ballparks across the nation

What ACCO Delivered

As a member of the renovation team, ACCO provided HVAC Design/Assist services and installed the related mechanical equipment.

Each of the 35 new luxury suites is served by a dedicated Carrier package heat pump for complete flexibility in temperature control and energy usage. Custom-programmed Carrier thermostats allow guests to enable the AC system for an 8-hour duration with the push of a button. Additionally, they can adjust the temperature set-points as desired without worrying about accidental programming changes to the base program.

The stadium has maintained much of its original look, but with the completion of the renovation project, Dodger Stadium has more to offer: additional seats, amenities, restaurants and comfort.

Project Team

Owner: Los Angeles Dodgers

Architect: NBBJ Sports & Entertainment

General Contractor: Gordon & Williams

Mechanical Engineer: Ove Arup & Partners

Mechanical Contractor: ACCO Engineered Systems

Download PDF
  
  

Search Results for