Projects
Sort by: Project Type, filter by | Geographic Market

Salesforce Tower
Location: San Francisco,CA
Date: September 2017
Customer Segment: Office Building
Project Type: HVAC, LEED*
Geographic Market: Bay Area
Reaching a height of over 1,000 ft, Salesforce Tower is one of the tallest commercial office buildings on the West Coast. Construction of this project is nearly finished--when complete, the building will achieve LEED Platinum through innovations that include underfloor air distribution system, unique floor by floor tri-path AHUs, cogeneration systems, individual floor outside air and relief systems, and mid-rise mechanical rooms to allow for a hydraulic pressure break. More

The Wilshire Grand Center
Location: Los Angeles, CA
Date: June 2017
Customer Segment: Hospitality
Project Type: Design-Build, HVAC, LEED*, Design-Assist, Chiller
Geographic Market: Greater Los Angeles
The Wilshire Grand in Downtown Los Angeles is the tallest structure west of the Mississippi. At 2.1 million sf, 75-stories and 1,100 feet tall, it includes 900 hotel rooms, 45,000 sf of retail and restaurant space, and 400,000 sf of Class A office space. More

Major HVAC Renovation San Diego Executive Campus
Location: San Diego, CA
Date: September 2016
Customer Segment: Office Building
Project Type: HVAC, LEED*, Chiller, Mechanical Retrofit
Geographic Market: San Diego
ACCO’s esteemed client is a prominent owner and manager of properties throughout coastal California. This high profile 825,000 square foot Class A office campus located in the heart of the University Towne Center area of San Diego had various buildings needing mechanical upgrades due to outdated, inefficient equipment. The customer had two urgent needs in two very different buildings; one was the changeout of a cooling tower on a 20 story commercial office roof and the other was a chiller replacement in a multi-story, multi-tenant building. Both buildings were LEED certified with high standards. More

City Center Bellevue - AHU Energy Retrofit
Location: Bellevue, WA
Date: August 2016
Customer Segment: Office Building
Project Type: Mechanical Retrofit
Geographic Market: Pacific Northwest
This 27-story building in the heart of Downtown Bellevue needed an energy retrofit to update its presence. The original air-handling units installed in 1989 were a far cry from the efficiency of the more modern buildings in the vicinity. As a means to attract tenants and keep monthly operating costs down, American Assets Trust tasked ACCO with designing an optimal solution. More

Golden 1 Center (Kings Arena)
Location: Sacramento, CA
Date: July 2016
Customer Segment: Stadium/Arena
Project Type: HVAC, Design-Assist
Geographic Market: Sacramento/Capitol Corridor
The Sacramento Kings and the City of Sacramento set out to build a state-of-the-art venue to bring back marquee events and become the cornerstone for the revitalization of the Downtown area. ACCO was brought in as a design/assist partner on the arena for our expertise and experience. More

Petersen Automotive Museum
Location: Los Angeles, CA
Date: November 2015
Customer Segment: Entertainment/Museums
Project Type: Design-Build, HVAC, Controls, Chiller
Geographic Market: Greater Los Angeles
The project includes a complete exterior transformation and a dynamic redesign of the interior, resulting in a world class museum that showcases the art, experience, culture and heritage of the automobile. massive renovations to the existing building’s infrastructure and interiors, as well as a major exterior renovation. More

Commercial Office Building
Location: Pasadena, CA
Date: October 2015
Customer Segment: Office Building
Project Type: Mechanical Retrofit
Geographic Market: Greater Los Angeles
ACCO had just completed a diagnostic of this 8 story, 130,000 square foot commercial office building’s mechanical system, recommending full system upgrades. Within 3 months and during a record-breaking heat wave in March, one of the four DX built system compressors stopped functioning and tenants were complaining. More

Mission High School - SFUSD
Location: San Francisco
Date: September 2015
Customer Segment: Education
Project Type: Boiler Retrofit
Geographic Market: Bay Area
Mission High School, located around the neighborhoods of Castro and Upper Market, is one of eighteen high schools within the San Francisco Unified School District (SFUSD). It relies on two steam boilers to heat their radiators that are spread throughout the classrooms and hallways, one of which had already failed and was abandoned. The second boiler was past its useful life and had frequent mechanical failures. More

222 Second Street - Plumbing
Location: San Francisco, CA
Date: August 2015
Customer Segment: Office Building
Project Type: Design-Build, Plumbing, LEED*, BIM
Geographic Market: Bay Area
Tishman Speyer commissioned the design and construction of a 26 story class “A” high rise office building. The building is located in the South of Market area of San Francisco. LEED and sustainable building design goals have been at the forefront of the Owner’s vision for the development. More

222 Second Street - HVAC
Location: San Francisco, CA
Date: August 2015
Customer Segment: Office Building
Project Type: Design-Build, HVAC, LEED*, BIM
Geographic Market: Bay Area
Tishman Speyer commissioned the design and construction of a 26 story class “A” high rise office building. The building is located in the South of Market area of San Francisco. More