Projects

Sort by: Project Type, filter by | Geographic Market

CPI, Inc.

Location: Palo Alto, CA

Date: December 2014

Customer Segment: Office Building

Project Type: Chiller, Mechanical Retrofit

Geographic Market: Bay Area

Communications & Power Industries (CPI) develops, manufactures and globally distributes components and subsystems used in the generation, amplification, transmission and reception of microwave signals for a wide variety of systems. An RFP was issued to replace a very old centrifugal chiller in order to provide a reliable system and improve energy efficiency. More

Chilled Water Plant Cooling Tower Replacement

Location: San Diego, CA

Date: December 2014

Customer Segment: Central Plants

Project Type: Chiller

Geographic Market: San Diego

In the heart of downtown San Diego stands this interesting Art Deco design building which is actually a chilled water plant. This center supplies cooling to buildings in the central business district with a capacity of 8,000 installed tons, serving 2 million square feet of local high rise buildings. The plant contains 4 large cooling towers, with 2 of the 4 past their life expectancy and were not providing adequate heat rejection. More

Multi-Use Commercial Office Buildings

Location: Irvine, CA

Date: October 2014

Customer Segment: Office Building

Project Type: Mechanical Retrofit

Geographic Market: Orange County

In Irvine and located 5 blocks from the Orange County Airport, these 2 multi-use commercial office buildings were in need of new mechanical equipment. Constructed in 1986, the 240,000 square foot buildings contained old, energy inefficient equipment that was causing down time due to repairs and equipment failures. More

Levi's® Stadium

Location: Santa Clara, CA

Date: August 2014

Customer Segment: Stadium/Arena

Project Type: Design-Build, HVAC, Controls, BIM

Geographic Market: Bay Area

The San Francisco 49ers kicked off the 2014 season in their new, open air, $1.2 billion stadium in Santa Clara. Construction of the 68,500 seat facility started in April 2012 and concluded before the first preseason game against the Broncos on August 17th, 2014. More

Community College

Location: San Diego County, CA

Date: August 2014

Customer Segment: Education

Project Type: Mechanical Retrofit

Geographic Market: San Diego

Stretching over 121 acres in Oceanside, CA, this prominent Southern California coastal Community College was relying on an antiquated 350 ton air chiller to cool 60% of its’ campus buildings. The chiller was past its life expectancy, experiencing frequent mechanical failures and corrosion. In addition, it was running on R-22 refrigerant which is being phased out of production due to environmental restrictions from the E.P.A. More

Twin Towers Residential Buildings - Mechanical Upgrade

Location: Los Angeles, CA

Date: August 2014

Customer Segment: Residential

Project Type: HVAC, Chiller

Geographic Market: Greater Los Angeles

An ACCO Service Maintenance customer for over 20 years, this HOA in the Los Feliz neighborhood of Los Angeles consulted with ACCO to upgrade its’ central plant.The 14-story, 360,000 SF twin tower condominiums contained two 160 ton reciprocating chillers installed in the early 1980s. The chillers were worn out, losing compressors, and had major operational inefficiencies. More

Commercial Office Building

Location: Culver City, CA

Date: July 2014

Customer Segment: Office Building

Project Type: HVAC

Geographic Market: Greater Los Angeles

Located in “The Heart of Screenland” this 5 story office building was built in 1984 and is surrounded by beautiful gardens and fountains. The 115K square foot structure was being cooled by 1998 60 ton Carrier package units that were old, rusting, and in need of repairs. In addition, the units were running on R-22 refrigerant which is being phased out of production due to environmental restrictions from the E.P.A. ACCO, as an SCE approved HVAC Optimization contractor, introduced this property management client to the benefits of the HVAC Early Retirement program. The program, which is funded by the CPUC (California Public Utilities Commission), provides contractor rebates for upgrading to more energy efficient HVAC equipment. This funding will continue and be granted on a first come first serve basis. More

888 Brannan - airbnb

Location: San Francisco, CA

Date: June 2014

Customer Segment: Office Building

Project Type: Design-Build, HVAC, Controls, LEED*

Geographic Market: Bay Area

This five (5) story office building was originally built beginning in 1917. It features more than 300,000 square foot of office space and around 110,000 square foot of retail space. The major renovation which started in 2011 includes a nice large atrium area and upgraded double pane windows while preserving the historic integrity of the building. More

Cedars-Sinai Medical Towers

Location: Los Angeles, CA

Date: February 2014

Customer Segment: Healthcare

Project Type: HVAC

Geographic Market: Greater Los Angeles

Cedars-Sinai Medical Towers in Los Angeles are two 166,000 square foot medical office buildings managed by REIT Management and Research.  Both buildings were in need of a mechanical upgrade; each of the buildings had its own central plant comprised of four 150 ton compressors using 1950’s reciprocating technology.  In addition to being inefficient, the compressors and refrigeration components had been experiencing a high rate of failure. More

Major Medical Office

Location: Bellflower, CA

Date: January 2014

Customer Segment: Healthcare

Project Type: Boiler Retrofit

Geographic Market: Greater Los Angeles

This major medical facility is a converted hospital that was operating with 2 high temperature, high pressure 250 HP hot water boilers installed in 1974, that, through heat exchangers provided steam for medical equipment, domestic hot water and space heating hot water. The boilers were at the end of their useful life and one set had been shutdown to comply with SCAQMD emissions codes, resulting in lost redundancy. More

  
  

Search Results for