Projects

Sort by: Project Type, filter by | Geographic Market

California Berkeley Memorial Stadium

Location: Berkeley, CA

Date: February 2013

Customer Segment: Stadium/Arena

Project Type: HVAC, Design-Assist

Geographic Market:

Project was to provide a seismic upgrade of the historical Cal Memorial Stadium. The existing historical façade was preserved while the west side seating and concessions were replaced. All in all, the design and contractor team had to work collaboratively in a design-assist manner to accomplish the common goal of opening the stadium on the first game day, which was a major accomplishment. More

Salesforce Tower

Location: San Francisco,CA

Date: September 2017

Customer Segment: Office Building

Project Type: HVAC, LEED*

Geographic Market: Bay Area

Reaching a height of over 1,000 ft, Salesforce Tower is one of the tallest commercial office buildings on the West Coast. Construction of this project is nearly finished--when complete, the building will achieve LEED Platinum through innovations that include underfloor air distribution system, unique floor by floor tri-path AHUs, cogeneration systems, individual floor outside air and relief systems, and mid-rise mechanical rooms to allow for a hydraulic pressure break. More

Mission High School - SFUSD

Location: San Francisco

Date: September 2015

Customer Segment: Education

Project Type: Boiler Retrofit

Geographic Market: Bay Area

Mission High School, located around the neighborhoods of Castro and Upper Market, is one of eighteen high schools within the San Francisco Unified School District (SFUSD). It relies on two steam boilers to heat their radiators that are spread throughout the classrooms and hallways, one of which had already failed and was abandoned. The second boiler was past its useful life and had frequent mechanical failures. More

222 Second Street - Plumbing

Location: San Francisco, CA

Date: August 2015

Customer Segment: Office Building

Project Type: Design-Build, Plumbing, LEED*, BIM

Geographic Market: Bay Area

Tishman Speyer commissioned the design and construction of a 26 story class “A” high rise office building. The building is located in the South of Market area of San Francisco. LEED and sustainable building design goals have been at the forefront of the Owner’s vision for the development. More

222 Second Street - HVAC

Location: San Francisco, CA

Date: August 2015

Customer Segment: Office Building

Project Type: Design-Build, HVAC, LEED*, BIM

Geographic Market: Bay Area

Tishman Speyer commissioned the design and construction of a 26 story class “A” high rise office building. The building is located in the South of Market area of San Francisco. More

Major Animation Studio

Location: Northern California

Date: July 2015

Customer Segment: Office Building

Project Type: HVAC, Mechanical Retrofit

Geographic Market: Bay Area

The customer is a major animation studio based in Northern California, very technology driven, extremely conscious of noise and vibration and concerned about energy savings. More

Large Silicon Valley Company

Location: Redwood City, CA

Date: April 2015

Customer Segment: Data Center

Project Type: Design-Build, Controls, Mechanical Retrofit

Geographic Market: Bay Area

ACCO Engineered Systems completed a design-build retrofit of the mechanical cooling systems, which included four new 125-ton Bitzer rotary screw compressors, ABB Soft Starts, two 6-section cooling coil banks, and new compressor controls based on Automated Logic Corporation (ALC) hardware and software. More

CPI, Inc.

Location: Palo Alto, CA

Date: December 2014

Customer Segment: Office Building

Project Type: Chiller, Mechanical Retrofit

Geographic Market: Bay Area

Communications & Power Industries (CPI) develops, manufactures and globally distributes components and subsystems used in the generation, amplification, transmission and reception of microwave signals for a wide variety of systems. An RFP was issued to replace a very old centrifugal chiller in order to provide a reliable system and improve energy efficiency. More

Levi's® Stadium

Location: Santa Clara, CA

Date: August 2014

Customer Segment: Stadium/Arena

Project Type: Design-Build, HVAC, Controls, BIM

Geographic Market: Bay Area

The San Francisco 49ers kicked off the 2014 season in their new, open air, $1.2 billion stadium in Santa Clara. Construction of the 68,500 seat facility started in April 2012 and concluded before the first preseason game against the Broncos on August 17th, 2014. More

888 Brannan - airbnb

Location: San Francisco, CA

Date: June 2014

Customer Segment: Office Building

Project Type: Design-Build, HVAC, Controls, LEED*

Geographic Market: Bay Area

This five (5) story office building was originally built beginning in 1917. It features more than 300,000 square foot of office space and around 110,000 square foot of retail space. The major renovation which started in 2011 includes a nice large atrium area and upgraded double pane windows while preserving the historic integrity of the building. More

  
  

Search Results for