b"PROJECT PROFILE NVIDIA Mission CollegeSanta Clara, CAProject Team other reliability testing machines. Construction started Owner/Occupant: NVIDIA Corporationin April 2023 and was completed in January 2024.Architect: Devcon ConstructionACCOs scope included mechanical, plumbing, process General Contractor: Devcon Constructionand controls as well as the BIM coordination role for Plumbing/Mechanical Contractor: ACCO Engineeredthe project. The project was extremely fast-paced Systems and was awarded in a negotiated fashion to allow for Project Overview a seamless transition to implement Taylor Engineers' ACCOs ability to deliver above and beyond has basis of design (BOD). ACCO was involved in BOD created many repeat customers. One such client is development through the execution of HVAC, plumbing the software company NVIDIA, which has trusted and process trades. The existing building structure was ACCO with several of its buildings in the past includingnot intended for such a robust build-out. As a result, the NVIDIA Voyager and NVIDIA Endeavor projects. special attention was spent up front on the structure to A more recent project with NVIDIA is the Missioncoordinate structural walls to support the distribution College project located in Santa Clara, CA. from the new Central Utility Plant (CUP). The project was a two-story 100,000-square-footAdditionally, ACCO assisted NVIDIA in the development retrofit of an existing data center that was previouslyof their flushing procedure for the liquid-cooled server gutted by the building owner. NVIDIA utilized theloop. Existing variable air volume (VAV) package units existing eight megawatts of power fed to the buildingand boilers were used to meet heating and ventilation to turn it into a premier lab building providing air andrequirements. ACCO installed a new 1,800-ton plant to liquid-cooled servers, bench-testing equipment andserve In-Row Cooling Units, liquid-cooled servers and other liquid-cooled NVIDIA test equipment.14|Summer 2024"