California Wants Large Buildings to Cut Energy Use, Not Just Report It

By Alexander Wassie, Lead Energy Analyst

Since June 2018, California has asked large buildings one question every year: how much energy do you use?

Soon it may ask a harder one: how much less are you using?

In July, the California Energy Commission released its draft strategy for a statewide Building Performance Standard (BPS). If the Legislature acts on it, roughly 50,000 large buildings would face energy and emissions targets that tighten every five years until 2045.

It isn’t law yet. But the outline is clear, and the data that could set each building’s baseline may already be getting collected. Here’s what owners, operators and energy professionals should know.

From reporting to performing

California’s benchmarking law, AB 802, passed in 2015. It has required large buildings to report energy use every year since June 2018. In 2023, SB 48 told the CEC to figure out how to turn that data into results. The draft strategy is the answer.

The stakes are big. Existing buildings use over 70% of the state’s electricity and over half its natural gas, and produce about a quarter of its greenhouse gas emissions.

Who’s Covered?

  • Commercial and multifamily buildings over 50,000 sq ft
  • About 50,000 buildings, covering roughly 60% of California’s floor area
  • Buildings that are mostly labs, manufacturing or industrial space are exempt

Two numbers that will matter

  1. Site energy use intensity (EUI). Total energy used on site per square foot.
  2. Onsite greenhouse gas intensity (GHGI). Emissions from fuel burned on site, mostly natural gas. Grid electricity counts as zero, so swapping a gas boiler for a heat pump moves this number fast.

Each building would get its own glide path from a baseline to a 2045 target, checked every five years. Strong performers get a gentler slope.

Flexible, but no pay-to-skip

The draft gives owners real room to maneuver:

  • Portfolio compliance across multiple buildings
  • Adjusted timelines, baselines or targets for hardship, historic buildings or technical limits
  • Building Performance Action Plans for buildings with unique constraints, including affordable housing

What it doesn’t include: a fee you can pay instead of improving, as Boston, Seattle and Maryland allow. Penalties would fund compliance help, not the general fund.

Tenants get protection too. Owners couldn’t pass penalties on to residential or small commercial tenants, and the draft proposes safeguards against displacement during retrofits.

The timeline

  • July 2026: CEC releases the draft strategy and holds a public workshop
  • Next: The Legislature would need to pass a bill; then the CEC writes the rules
  • Likely 2025–2028: Benchmarking data averaged to set each building’s baseline
  • 2030 at the earliest: First binding statewide targets
  • Every five years after: Compliance checkpoints
  • 2045: Final targets

That baseline window is the part to notice. Your building’s recent and upcoming benchmarking reports could become the starting line you’re measured against.

Benchmarking enforcement may tighten too. State law already lets the CEC seek penalties of up to $2,000 per day for missing benchmarking data, but no fines have been reported so far. With compliance around 50%, the CEC says it plans to step up enforcement and recommends having reported data verified by a licensed professional.

Local rules may hit first

The state plan defers to cities with stronger standards. Chula Vista and West Hollywood have already adopted BPS programs. Los Angeles, San Diego, San Francisco, Berkeley, Sacramento, Santa Monica and LA County are developing their own.

San Francisco shows how they can stack. The city already requires benchmarking and a five-year energy audit for commercial buildings over 10,000 sq ft, and its proposed BPS would reach buildings down to 20,000 sq ft. A mid-sized SF office could face city targets without ever crossing the state threshold.

What to do now

  1. Benchmark carefully. Treat every report from here on as a possible baseline.
  2. Map your natural gas loads. Boilers, furnaces and water heaters drive the emissions target. Plan replacements before they fail, not after.
  3. Get an energy audit. Controls, schedules and lighting are usually the cheapest EUI wins.
  4. Watch onsite generation. If you have district steam, cogeneration or fuel cells, follow the rulemaking closely; they may count as onsite combustion.
  5. Know your local rules. Your city may move sooner and reach smaller buildings.

The details will change before anything takes effect. The direction won’t: less energy use, less natural gas use, measured every five years until 2045.

Are you already planning for this, or waiting for the final rules? Get in touch with our team to learn more and discuss how to approach it.

Frequently Asked Questions (FAQ):

What can I do now to improve my building’s energy performance without major capital investments?

ACCO’s energy team can perform an energy audit to identify low-cost operational improvements, such as optimizing HVAC controls, operating schedules, and lighting. Accurate energy benchmarking is also essential, as current data may help establish your building’s future performance baseline.

Will I need to replace my existing HVAC equipment to comply?

Not necessarily. Requirements will depend on your building’s energy performance, existing equipment, and compliance timeline. Buildings with fossil fuel-powered HVAC systems may eventually need to transition to electric alternatives. ACCO can help evaluate your equipment and develop a practical compliance strategy.

Should I start planning to replace gas-powered boilers and heating equipment with electric alternatives?

Yes, evaluating your natural gas equipment now allows you to plan for electrification as systems approach the end of their useful life. Proactive planning can help reduce costs, avoid emergency replacements, and support future emissions targets. 

Should I make improvements now or wait until California finalizes the regulations?

Start planning now. Current benchmarking data may influence future compliance targets, and some local jurisdictions already have building performance requirements. Early planning provides greater flexibility to prioritize improvements, manage costs, and coordinate equipment replacements.

ACCO is here to help. Every facility is different. Contact ACCO to evaluate your building’s energy performance, understand potential compliance requirements, and identify the most cost-effective path forward.