Theragent utilized an existing office and warehouse building to fit out a new Contract Development Manufacturing Organization (CDMO) facility for manufacturing cell and gene therapies for cancer patients. The 26,000 sq ft warehouse was redesigned into GMP-certified modular cleanrooms and supporting lab space.
PROJECT FEATURES
- Design Build HVAC & Plumbing
- Fast-paced, completed in 18-months
PROJECT SUMMARY
The integrated cleanroom system includes four modular “flex suites, ” each equipped with 100% HEPA filtered air circulation units, and designated support space for disinfecting manufacturing products and purified water. All cleanrooms feature a walkable ceiling to help maintain the integrity of the cleanroom environment and to keep all mechanical and ventilation infrastructure accessible for maintenance.
The project included a 4-degree cold room, -80 degree and liquid nitrogen cryopreservation room, a gas utility room, a final release labeling room, and auxiliary storage space to store reagents, components, and kits. Lab space includes analytical labs for microbiological studies, quality control operations, and product development testing.
The project also includes new boilers to support the mechanical systems, a standby generator, a liquid nitrogen tank, storage facility for waste management, and new air handling units.

