222 Second Street - Plumbing

Location: San Francisco, CA

Date: August 2015

Customer Segment: Office Building

Project Type: Design-Build, Plumbing, LEED*, BIM

Geographic Market: Bay Area

Tishman Speyer commissioned the design and construction of a 26 story class “A” high rise office building. The building is located in the South of Market area of San Francisco. LEED and sustainable building design goals have been at the forefront of the Owner’s vision for the development. More

222 Second Street - HVAC

Location: San Francisco, CA

Date: August 2015

Customer Segment: Office Building

Project Type: Design-Build, HVAC, LEED*, BIM

Geographic Market: Bay Area

Tishman Speyer commissioned the design and construction of a 26 story class “A” high rise office building. The building is located in the South of Market area of San Francisco. More

Governor George Deukmejian Court House

Location: Long Beach, CA

Date: August 2015

Customer Segment: Government

Project Type: HVAC, Design-Assist, BIM, Chiller

Geographic Market: Greater Los Angeles

Based on an AOC review in June 2007, it was recommended that the State construct a new court facility in Long Beach that addresses a current space shortfall and accessibility issues; increases security; replaces a seismically and functionally deficient facility; and provides space for future growth.  More

Levi's® Stadium

Location: Santa Clara, CA

Date: August 2014

Customer Segment: Stadium/Arena

Project Type: Design-Build, HVAC, Controls, BIM

Geographic Market: Bay Area

The San Francisco 49ers kicked off the 2014 season in their new, open air, $1.2 billion stadium in Santa Clara. Construction of the 68,500 seat facility started in April 2012 and concluded before the first preseason game against the Broncos on August 17th, 2014. More

SMUD East Campus Operations Center

Location: Sacramento, CA

Date: September 2013

Customer Segment: Office Building

Project Type: Design-Build, HVAC, LEED*, BIM, LEAN/IPD

Geographic Market: Sacramento/Capitol Corridor

The design of the new SMUD East Campus Operations Center required a highly collaborative approach between all of the team members. Balancing critical facets of the building system including structural, mechanical, electrical and extensive energy modeling. The continual balancing of efficient building envelope construction and energy consumption of the mechanical and electrical systems, allowed the design and construction team to provide the minimum amount of photovoltaic (PV) panels necessary to create a net-zero campus of the 6-story office building and four yard buildings. More

Sacramento International Airport - Terminal B

Location: Sacramento, CA

Date: September 2012

Customer Segment: Aerospace

Project Type: HVAC, Plumbing, LEED*, Design-Assist, BIM, LEAN/IPD

Geographic Market: Sacramento/Capitol Corridor

The Sacramento International Airport recently celebrated the opening of the new Terminal B for its $1.1-billion terminal modernization program: the Big Build. The “Big Build” is the largest public construction project in Sacramento County’s history. In addition to the expanded airline capacity and the Automated People Mover, the new Terminal B also features top notch area restaurants and eye-catching artwork including a 56-foot tall red rabbit. More

Equinix SV5

Location: San Jose, CA

Date: August 2012

Customer Segment: Data Center

Project Type: HVAC, Design-Assist, BIM, LEAN/IPD

Geographic Market: Bay Area

Equinix is the world leader in providing Co-Location data center space for rent.  Silicon Valley 5, or SV5, is Equinix’s brand new Co-Lo data center facility in the Bay Area.  It is comprised mainly of data center space with a small office area in the front of the building. More

UCSF IRM

Location: San Francisco, CA

Date: January 2012

Customer Segment: Education

Project Type: Design-Build, HVAC, Plumbing, Controls, Process Piping, LEED*, BIM, LEAN/IPD

Geographic Market: Bay Area

This 75,000 sf newly constructed building is comprised of offices and laboratories. There are four independent pods to this building that allow the building’s elevation to change with the naturally surrounding landscape. This new building is connected to other campus buildings via an open air bridgeway. The project has a Design Build with Best Value and IPD Delivery Method. More

Caltrans District 3 Office Building

Location: Marysville, CA

Date: October 2011

Customer Segment: Government

Project Type: Design-Build, HVAC, Controls, LEED*, GSA, BIM, LEAN/IPD

Geographic Market: Sacramento/Capitol Corridor

Designed from the inside out, the new Caltrans District 3 office building is the office of the future. More

Mills Peninsula Hospital

Location: Burlingame, CA

Date: May 2011

Customer Segment: Hospital

Project Type: HVAC, OSHPD, BIM, LEAN/IPD

Geographic Market: Bay Area

The new Mills Peninsula Hospital is a 422,000 sq. ft. base-isolated OSHPD Level 1 hospital. The new hospital includes 313 beds, 10 operating rooms, and 2 C-section rooms. More

  
  